JLS Pioneering Spirit, Allseas
Client:
Allseas
Project
JLS, Pioneering spirit
Location
Netherlands, Norway and Tenerife
Description
During the installation of mv Pioneering Spirit’s Jacket Lift System, Dutch Machining Group have assisted Allseas with practical advice in the design phase and solutions for challenges encountered in the execution phase. Machining on board involved milling eight skid shoes and twelve meters of skid rail, line boring several sheave boxes and the line boring of in total eight holes in four Hof castings, each with a diameter of 1,4 meters.